PS Power buying guide

Generator Sizing Guide Bangladesh

Correct generator sizing starts with a load schedule and starting sequence, not a rough percentage added to connected load.

Updated: 30 September 2026

Load schedule

List critical loads, kW/kVA, phase, PF and simultaneity.

Motor starting

Pumps, compressors and lifts can drive transient sizing.

Growth

Allow reasonable expansion without oversizing the diesel engine excessively.

What a serious buyer should verify

Compare technically equivalent offers: exact model and rating, scope of supply, installation responsibility, commissioning, warranty, spare-parts path and after-sales support. For industrial projects, initial purchase price alone is not a complete lifecycle comparison.

How to use this guide

This guide provides a practical starting point for buyers and technical teams. Use the related guides to compare capacity, configuration, installation and lifecycle-support requirements before requesting a project-specific quotation.

Final decisions should use current quotations, manufacturer data and project-specific engineering rather than treating a general web page as the final specification.

Questions that improve a technical quotation

Ask the supplier to state assumptions instead of leaving them implicit: operating duty, environmental conditions, included accessories, site works, tests, delivery, commissioning, warranty and exclusions. If two offers cannot be normalized to the same scope, their prices are not directly comparable.

For a major purchase, keep the final technical schedule attached to the commercial order. This reduces ambiguity later when equipment is inspected, installed or handed over.

Research methodology and freshness

PS Power buying guides separates company claims, public third-party data and general engineering guidance. Dataset-specific figures are labelled with their scope; competitor names are used for buyer comparison without implying affiliation; and technical values are treated as references until verified against the final project and manufacturer documentation. Updated 30 September 2026.

Evidence worth requesting before purchase

Ask for the manufacturer data sheet, serial/model references, warranty terms, commissioning checklist and a clear list of inclusions and exclusions. For high-capacity or critical installations, request evidence of load testing and confirm the site engineering assumptions before delivery.

Brands commonly researched in Bangladesh

Industrial buyers frequently research Perkins, Cummins, Ricardo, Mitsubishi, Volvo Penta, Yanmar, Weichai, Yuchai, MTU, Baudouin, Doosan, Lovol. The practical comparison is not only brand versus brand: exact engine model, complete genset configuration, project duty and after-sales support determine whether a proposal fits the application.

Generator specification checklist

ComponentWhat should be written in the offer
EngineManufacturer and exact engine model.
AlternatorManufacturer/model and insulation/protection class where specified.
ControllerExact controller and required communications.
RatingPrime and standby kVA/kW with applicable standard.
EnclosureOpen, silent canopy or containerized configuration.
SwitchingATS, motorized breaker or synchronizing scope.
Site worksFoundation, exhaust, fuel, cable, earthing and commissioning responsibility.

Related research

Need the correct generator size and quotation?

Send your load, application, preferred brand if any and site location for a generator quotation.